• English
  • Bahasa Indonesia
  • Sumbawa Timur Mining

    About Us

    Onto Deposit In the prospecting phase of 2013, Sumbawa Timur Mining (STM) discovered one of the most exciting copper-gold discoveries in the last 20 years, which we call the Onto Deposit. The Onto Deposit has its own challenges, as it is located hundreds of meters below the earth's surface, and it's surrounded by extreme heat. Thus, underground mining with sophisticated drying and cooling techniques is needed to develop a safe underground mine. STM aims to develop the Onto deposit into a safe and reliable underground mining operation.
    Sumbawa Timur Mining
    2020
    2022
    Sumbawa Timur Mining Sumbawa Timur Mining
    Onto Deposit Resource Estimate Journey
    Sumbawa Timur Mining
    Mining Phase
    Sumbawa Timur Mining Prospecting Investigation and search activities to find deposits of valuable minerals.
    Sumbawa Timur Mining Pre-Feasibility Study
    (STM is here since 2019)
    A pre-feasibility study that includes sufficient mineral exploration work, including drilling, to serve as the basis for a mineral resource report, potential ore body model, and scoping study.
    Sumbawa Timur Mining Feasibility Study Analytical studies that measure and evaluate project feasibility to provide a more concrete picture of the company's achievements and challenges in the future.
    Sumbawa Timur Mining Construction Construction involves building the mine site infrastructure and its supporting facilities.
    Sumbawa Timur Mining Mining Operation Underground mining with a block cave mining system for mineral ore extraction.
    Sumbawa Timur Mining Mine Closure Mine closure is the period when the ore-extracting activities of a mine have ceased, and final decommissioning and mine reclamation are being completed.
    Sumbawa Timur Mining
    Sumbawa Timur Mining